Total Site Utility Systems Structural Design Considering Electricity Price Fluctuations

Walmsley, T.G. Philipp, M. Varbanov, P.S. Klemeš, J.J.

Anglický název

Total Site Utility Systems Structural Design Considering Electricity Price Fluctuations

Typ

kapitola v knize

Jazyk

en

Originální abstrakt

This study aims to optimise the structural design of industrial central utility systems to while taking full advantage of intra-day electricity spot price fluctuations. Surges renewable electricity generation uptake has amplified the rises and falls between peak and off-peak electricity prices. Industrial Total Sites and Locally Integrated Energy Sectors can take maximum advantage of periods of both low and high electricity prices through appropriate technology investment. Using P-graph, a Utility Systems Planner superstructure is extended to apply a multi-period analysis to optimally select the fuels, energy conversion technologies, and the requires sizes to install for a representative case study. A key difference between the multi-period solution and the single-period solution is an Electric Boiler that operates when the electricity price is low. This results in a Total Annual Cost saving of 7.5 %.

Anglický abstrakt

This study aims to optimise the structural design of industrial central utility systems to while taking full advantage of intra-day electricity spot price fluctuations. Surges renewable electricity generation uptake has amplified the rises and falls between peak and off-peak electricity prices. Industrial Total Sites and Locally Integrated Energy Sectors can take maximum advantage of periods of both low and high electricity prices through appropriate technology investment. Using P-graph, a Utility Systems Planner superstructure is extended to apply a multi-period analysis to optimally select the fuels, energy conversion technologies, and the requires sizes to install for a representative case study. A key difference between the multi-period solution and the single-period solution is an Electric Boiler that operates when the electricity price is low. This results in a Total Annual Cost saving of 7.5 %.

Klíčová slova anglicky

Energy planning; Process Integration; Total Site; Utility Systems

Vydáno

01.01.2018

Nakladatel

Elsevier B.V.

ISBN

978-0-444-64241-7

Kniha

Computer-Aided Chemical Engineering

Číslo edice

44

Strany od–do

1159–1164

Počet stran

6

BIBTEX


@inbook{BUT151708,
  author="Timothy Gordon {Walmsley} and Petar Sabev {Varbanov} and Jiří {Klemeš},
  title="Total Site Utility Systems Structural Design Considering Electricity Price Fluctuations",
  booktitle="Computer-Aided Chemical Engineering",
  year="2018",
  month="January",
  pages="1159--1164",
  publisher="Elsevier B.V.",
  isbn="978-0-444-64241-7"
}