Originální abstrakt
This study aims to optimise the structural design of industrial central utility systems to while taking full advantage of intra-day electricity spot price fluctuations. Surges renewable electricity generation uptake has amplified the rises and falls between peak and off-peak electricity prices. Industrial Total Sites and Locally Integrated Energy Sectors can take maximum advantage of periods of both low and high electricity prices through appropriate technology investment. Using P-graph, a Utility Systems Planner superstructure is extended to apply a multi-period analysis to optimally select the fuels, energy conversion technologies, and the requires sizes to install for a representative case study. A key difference between the multi-period solution and the single-period solution is an Electric Boiler that operates when the electricity price is low. This results in a Total Annual Cost saving of 7.5 %.
Anglický abstrakt
This study aims to optimise the structural design of industrial central utility systems to while taking full advantage of intra-day electricity spot price fluctuations. Surges renewable electricity generation uptake has amplified the rises and falls between peak and off-peak electricity prices. Industrial Total Sites and Locally Integrated Energy Sectors can take maximum advantage of periods of both low and high electricity prices through appropriate technology investment. Using P-graph, a Utility Systems Planner superstructure is extended to apply a multi-period analysis to optimally select the fuels, energy conversion technologies, and the requires sizes to install for a representative case study. A key difference between the multi-period solution and the single-period solution is an Electric Boiler that operates when the electricity price is low. This results in a Total Annual Cost saving of 7.5 %.
Klíčová slova anglicky
Energy planning; Process Integration; Total Site; Utility Systems
Vydáno
01.01.2018
Nakladatel
Elsevier B.V.
ISBN
978-0-444-64241-7
Kniha
Computer-Aided Chemical Engineering
Číslo edice
44
Strany od–do
1159–1164
Počet stran
6
BIBTEX
@inbook{BUT151708,
author="Timothy Gordon {Walmsley} and Petar Sabev {Varbanov} and Jiří {Klemeš},
title="Total Site Utility Systems Structural Design Considering Electricity Price Fluctuations",
booktitle="Computer-Aided Chemical Engineering",
year="2018",
month="January",
pages="1159--1164",
publisher="Elsevier B.V.",
isbn="978-0-444-64241-7"
}